IceCube Drill site (foreground) and deployment site (back and to the left)
|
A group of cross-country skiers arrived at the pole after a lengthy trip and were treated to a look at the drilling operation. The hose at the right is the drill hose and on the left is the return hose which only goes down about 100m.
|
A leak developed in the drill hose, spewing hot water and steam into the air. The drillers kept drilling until the hose unreeled to the damaged area.
|
Drillers repairing the hose.
|
IceCube main cable reel as it is being unspooled into the hole. The drill hose reels in the background have not yet been moved to the next site.
|